School Information
Welcome | Contact Us | Change Contact Details | Links
new schools (2008-2009)

CENSUS

School Profile

Schools Lists

School Updates (New, Proposed, Closed)

School Statistical Reports

FAQ's

Student Enrolment - Additional Details

+ New (since last update)                                          To Search this Page - Ctrl+F                                   Last Updated:  26 Nov 2008
i  Further Information (pdf flow chart of process)
 
 

School Name

School Code

Opens IN

Change Details

Classification

Education District

Year Levels

 

Ashdale Secondary College (previously referred to with planning name Landsdale Senior High School)

4181*

2009

New School initially catering for Year 8 but moving to Year 12 (opens 2009)

 

Swan

Y08-Y12

 

Atwell College

4184*

2008

New School Expected to start with Years 7 and 8, incorporating a new campus called Kim Beazley Learning Community:  Atwell
Address:  201 Brenchley Drive, Atwell
Telephone:  (08) 9414 4300
Principal:  Mr Steven Crake
Steven.Crake@det.wa.edu.au

 

Fremantle-Peel

Y07-Y12

 

Australian Technical College - Pilbara

1482

2008

New Private School
Pundulmurra Campus - 1 Parker Street, South Hedland
Roebourne Campus - Fraser Street, Roebourne
Karratha Campus - Millstream Road, Karratha

Telephone:  (08) 9
1720 1966
Contact:  Dr Nancy Rees

 

Pilbara

Y11-12

i









i

Bannister Creek Primary School (previously referred to as Ferndale Primary School)













Bannister Creek Primary School (previously referred to with planning name Ferndale/Kinlock/ Lynwood Primary School)

5817















5817



 

2008









2009





2009

Renamed. Many students from Kinlock PS (5249) and Lynwood PS (5521), which closed in 2007 have joined this school. Students are expected to move to the amalgamated and new school, which is being built on the old Lynwood PS site, in late 2009. This new school retains the name 'Bannister Creek Primary School' and has a new code 5817.

Will close late in 2009.  Students will relocate to the replacement Bannister Creek Primary School see below in late 2009


Replacement school is expected to open in late 2009 on the Lynwood PS site.
Principal:  Mr Craig Ashby

















TBA

















Fremantle-Peel

















K-Y07

i

Blackmore Primary School

5544

2009

Closure in early 2009 (following amalgamation with Girrawheen PS) see 5576 below.

TBA

West Coast

K-Y07

 

Bletchley Park Primary School (previously referred to with planning name Southern River Primary School)

5808*

2008

New School located on the south east side of Balfour Street, midway between Furley Road and Barret Street.  Will provide relief to Excelsior PS
Telephone:  9394 0955 (opens 2008)
Principal:  Mr Christopher Partington

TBA (possibly PS Class 4)

Canning

K-Y07

 

Cape Naturaliste College (previously referred to with planning name Vasse Middle School)

4178*

2008

New School commencing with Year 8 students
Physical Address: Lot 2 Vass-Yallingup Siding, Vasse 6280
Postal Address
PO Box 688, Busselton 6280 Telephone:  9750 2600
Principal:  Mr Mark Gillett

HS Class 6A

Warren-Blackwood

Y08-Y10

i














i

Craigie Heights Primary School (previously referred to as Camberwarra Primary School)













Craigie Heights Primary School

5597















5816*

2008









2009





2009

Renamed. Many students from Craigie PS (5565), which closed in 2007 have joined this school. Students are expected to move to the amalgamated and new school, which is being built on the old Craigie PS site, in late 2009. This new school will retain the name 'Craigie Heights PS' but will have a new code 5816* see below.

Expected to close in late 2009. Students will relocate to the new facilities (Craigie Heights PS 5816*) which have been completed on the old Craigie PS site see 5816* below.

Amalgamated & new school
is expected to open late in 2009 on the Craigie PS site.
Principal:  Mr Gary Payne
















TBA
















West Coast
















K-Y07

 

Dalyellup College (previously referred to with planning names Dalyellup Secondary College/Dalyellup Middle School)

4183*

2009

New School expected to be operational for the start of the 2009 school year

TBA

Bunbury

Y07-10

 

Ellen Stirling Primary School (previously referred to with planning name Coolamon Primary School)

5805*

2008

New School Strathmore Pathway, Ellenbrook
Principal:  Mr Mike Prime

TBA (possibly PS Class 4)

Swan

K-Y07

 

Esperance Anglican Community School

 1481

2008

New Private School
Phillips Street
, Esperance
Telephone:  (08) 9083 2444

 

Esperance

Y08-10

 

Fitzroy Crossing District High School

4149

2009

New school buildings on a different site (retains existing school code). Expected to be finished in time for the 2009 school year

DHS

Kimberley

K-Y12

i






i

Girrawheen Primary School










Hudson Park Primary School (previously referred to as Girrawheen Primary School)

5576










5819*

2009










2009

Amalgamation of Girrawheen PS and Blackmore PS (5544 above) on the Girrawheen PS site and will be officially known as Hudson Park Primary School in 2009.  Girrawheen will be upgraded and it is expected that the schools will amalgamate in early 2009.  Hudson Park Primary School (formerly known as Girrawheen PS) will have a new code 5819*.

Amalgamation of Girrawheen PS (5576) and Blackmore PS (5544) on the Girrawheen PS site.  Opens early 2009.

TBA

Swan

K-Y07

i














i

Greenwood Primary School (previously referred to as East Greenwood Primary School)













Greenwood Primary School (previously referred to with planning name Allenswood/East Greenwood Primary School)

5631















5818*

2008









2009





2009

Renamed. Many students from Allenswood PS (5585), which closed in 2007 have joined this school. Students are expected to move to the amalgamated and new school which is being built on the old Allenswood PS site in late 2009. This new school will retain the name 'Greenwood PS' but will have a new code 5818*.

Expected to close
in late 2009. Students will relocate to the new facilities (Greenwood PS 5818*) which have been completed on the old Allenswood PS site see 5818* below.

Amalgamated & new school
is expected to open in late 2009 on the Allenswood Primary School site.
Principal:  Mr Ian Herbert
















TBA
















West Coast
















K-Y07

 

Hocking Primary School

5806*

2008

New School Will provide relief to East Wanneroo PS
Physical Address:
Gungurru Avenue, Hocking 6065
Principal:  Mr Steve Dickson

TBA (possibly PS Class 4)

West Coast

K-Y07

i

Karratha Senior College

4056

2009

New School on the site of Pilbara TAFE campus as part of the Karratha Education and Training Precinct (opens 2009). 4056 will split into two sites in mid 2009, one on the new site, one on the old. The same code 4056 will be used for both sites. 4056 (Karratha SHS) will continue as it is, (with Y8-Y12’s), until mid 2009 when the upper school ONLY, will go to the new site (4056, Karratha Senior College). The lower school will remain (at 4056 site) and “eventually” (possibly 2012?) the lower school students will join up with the upper school students, on the 4056 site.

TBA

Pilbara

Y10-Y12

 

Kim Beazley School

6009

2008

Will close at the end of 2008.  Secondary students will relocate at the commencement of Term 2, 2008 to a new campus of Atwell College (4184*) which will be known as the 'Kim Beazley Learning Community: Atwell' and primary students will also relocate at the beginning of 2009 to a new campus of the new primary school (5813*) in Success currently referred to as 'Success Primary School (planning name only)'.

 

Fremantle-Peel

 

 

Kingston Primary School (planning name only)

5810*

2009

New School to be constructed in the locality of Australind and will provide relief to Parkfield PS.  The proposed school site is bounded by Macquarie Dve, Sherwood Rd, Braidwood Dve and Lindfield Rd.  The new school will serve students who reside in the Kingston and Treendale areas of Australind and in Binningup (opens 2009)

TBA

Bunbury

 

i

Lockridge Primary School

5536

2009

Replacement school to be developed on the current Lockridge PS site.  It is scheduled for completion in late 2009.  The school will continue to operate on the site during the construction phase and the school will retain the same code.

TBA

Swan

K-Y07

+

Madeley Primary School

5811*

2009

New School to be constructed in the locality of Madeley (near Landsdale) and will provide relief to Ashdale PS.  The proposed school site is bounded by Lockeport Approach, Martindale Ave, the proposed Olivedale Rd and Amstel Park.  The new school will serve students who reside in the locality of Madeley (opens 2009)

TBA

Swan

 

+

Manea Senior College (previously referred to as Manea College)

4179*

2009

New School (opens 2009) on Bunbury SW TAFE site

 

 

 

i

Mt Barker Community College

4186*

2008

New School (opens 2008 with new facilities on the SHS site).  Stage One will see the upper primary students (Years 4 to 7), moving to the new site, to join the secondary students. The former Mt Barker PS (5318), which closed at the end of 2007, continues as a campus of the Community College.
Telephone:  (08) 9851 3400

Community College Class 6

Albany

K-Y12

 

Mt Hawthorn Primary School

5321

2008

Amalgamation Mt Hawthorn Junior Primary and Mt Hawthorn Primary School will amalgamate at the commencement of the 2008 school year.  Address will be 1 Killarney Street, Mt Hawthorn, 6016. School retains the same code.
Principal:  Mr Dale Mackesey

PS Class 4

West Coast

K-Y07

 

Peel Primary Behaviour Centre

6143*

2008

New Centre

 

 Fremantle/Peel

 

 

Roseworth Education Support Centre (previously referred to as Montrose Education Support Centre)

6055




 

2008




2009

Renamed and moved to the old Hainsworth PS site.  Will then move in late 2009 to new facilities being built on the old Montrose ESC site.

A replacement school to be built on the Hainsworth site.  It will retain its code (6055) and is expected to open in 2009
Principal:  Ms Patricia Watt






TBA






Swan






Y01-Y07

i














i

Roseworth Primary School (previously referred to as Hainsworth Primary School)













Roseworth Primary School (previously referred to with planning name Montrose/ Hainsworth Primary School)

5556















 5815*

2008









2009





2009

Renamed. Many students from Montrose PS (5570) which closed in 2007 have joined this school. Students are expected to move to the amalgamated and new school which is being built on the old Montrose PS site. This new school will retain the name 'Roseworth Primary School' but will have a new code 5815* see below.

Expected to close in late 2009.  Students will relocate to the new facilities (Roseworth PS 5815*) which have been completed on the old Montrose PS site see 5815* below.

Amalgamation & new school is expected to open late in 2009 on the Montrose PS site.
Principal:  Mr Geoff Metcalf















TBA















Swan















K-Y07

 

Safety Bay Primary School

5407

2009

Replacement school to be developed on the current Safety Bay PS site.  It is scheduled for completion in late 2009.  The school will continue to operate on the site during the construction phase and the school will retain the same code.

TBA

Fremantle-Peel

K-Y07

+

Somerly Primary School

5812*

2009

New School to be constructed in the locality of Clarkson and will provide relief to Clarkson PS.  The proposed school site is bounded by Connolly Dve, Somerly Dve, Orange Grove Blvd and public open space.  It is anticipated that the new school will serve students who reside in the south eastern half of the locality of Clarkson (opens 2009)

TBA

West Coast

 

 

South Halls Head Primary School

5807*

2008

New School bounded by Karon Vista, Eulie Court and Merlin Street.  Will provide relief to Halls Head PS
Physical Address:  38 Karon
Vista, Halls Head 6210
Telephone:  9583 5400
Principal:  Ms Jan Workman

TBA (possibly PS Class 4)

Fremantle-Peel

K-Y07

+

Success Primary School

5813*

2009

New School to be constructed in the locality of Success and will provide relief for both Harmony PS and Jandakot PS. The proposed school site is bounded by Meridian St, Wentworth Pde, Columbus Loop and public open space.  It is anticipated that the new school will serve students who reside in the southern part of the locality of Success (south of Bartram Rd) and in the locality of Hammond Park.  Will incorporate primary students relocating from the Kim Beazley School (opens 2009)

TBA

Fremantle-Peel

 

 

Tjuntjunjara Remote Community School

5814*

2008

New School Previously a campus of Yintarri Remote Community School.  As from 2008, will be a school in its own right.
Telephone:  (08) 9037 1113
Fax:  (08) 9037 1106

RCS

Goldfields

K-Y12

i

Waikiki Primary School

5781

2008

New School buildings on a different site.  The new site is on the south side of Arnside Bend and on the west side of Harrington Waters Drive and Kirkbride Meander (opens 2008)
Principal:  Mr Robert Dedman

PS Class 4

Fremantle-Peel

K-Y07